Project Name        :    EPC - Fuel Storage Terminal

Client                      :    SAMA PETROLEUM ENERGY FZC

Storage Capacity   :    5013 m3        4 Nos.     Ref. Standards  .. API 650

Storage Capacity   :    3848 m3        3 Nos.     Ref. Standards  .. API 650

Storage Capacity   :    678.5 m3       1 Nos.     Ref. Standards  .. NFPA

Year                       :    2014

Scope                     :    Engineering, fabrication, erection and testing of the following;

  1. fuel storage tanks as per API 650

  2. fire water tanks as per NFPA and Civil Defense Guide Lines

 

Fire Fighting System :

  1. Engineering, fabrication, erection and testing of the fire water tanks as per NFPA and Civil Defense Guide Lines

  2. Complete fire Water and Foam System as per NFPA and civil defense requirements

  3. Fire Pump Room with high pressure pumping system with 7 fire hydrants

  4. Foam Fire Fighting / deluge system with electrification

Piping : Engineering, Fabrication, erection and testing of the complete piping system for the Tank farm as per ASME B 31.3 Process Piping

Vision Middle East

December 31, 2014

Project Name      :    EPC - Vision Storage Terminal

Client                     :    Vision Middle East

Storage Capacity   :    10427.5m3    4 Nos.     Standards  .. API 650

Storage Capacity   :    17016m3       2 Nos.     Standards  .. API 650

Class                      :    Bureau Veritas

Year                       :    2015

Scope                     :    Engineering, fabrication, erection and testing of the following;

  1. fuel storage tanks as per API 650

  2. fire water tanks as per NFPA and Civil Defense Guide Lines

 

Fire Fighting System :

  1. Engineering, fabrication, erection and testing of the fire water tanks as per NFPA and Civil Defense Guide Lines

  2. Complete fire Water and Foam System as per NFPA and civil defense requirements

  3. Fire Pump Room with high pressure pumping system with 7 fire hydrants

  4. Foam Fire Fighting / deluge system with electrification

Piping : Engineering, Fabrication, erection and testing of the complete piping system for the Tank farm as per ASME B 31.3 Process Piping.

SHARAFCO Oil & Fuel Supply Fze

December 31, 2014

Project Name       :    EPC - SHARAFCO Storage Terminal

Client                    :    SHARAFCO Oil & Fuel Supply Fze

Storage Capacity   :    6912m3         8 Nos.     Standards  .. API 650

Storage Capacity   :    3888m3         6 Nos.     Standards  .. API 650

Storage Capacity   :    1257m3         2 Nos.     Standards  .. API 650

 

Class                      :    Bureau Veritas

Year                       :    2016

Scope                     :    Engineering, fabrication, erection and testing of the following;

  1. fuel storage tanks as per API 650

  2. fire water tanks as per NFPA and Civil Defense Guide Lines

 

Fire Fighting System :

  1. Engineering, fabrication, erection and testing of the fire water tanks as per NFPA and Civil Defense Guide Lines

  2. Complete fire Water and Foam System as per NFPA and civil defense requirements

  3. Fire Pump Room with high pressure pumping system with 7 fire hydrants

  4. Foam Fire Fighting / deluge system with electrification

Piping  :    Engineering, Fabrication, erection and testing of the complete piping system for the Tank farm as per ASME B 31.3 Process Piping.

Sharjah National Lube Oil CO LLC

December 31, 2015

Project Name       :    EPC - SHARLU Storage Terminal

Client                    :    Sharjah National Lube Oil CO LLC

Storage Capacity   :    443m3           1 No.       Standards  .. API 650

Storage Capacity   :    226 m3          3 Nos.     Standards  .. API 650

Storage Capacity   :    117 m3          6 Nos.     Standards  .. API 650

Storage Capacity   :    400 m3          1 No.       Standards  .. API 650

 

 

Year                       :    2016

Scope                     :    Engineering, fabrication, erection and testing of the following;

  1. fuel storage tanks as per API 650

  2. fire water tanks as per NFPA and Civil Defense Guide Lines

 

Fire Fighting System :

  1. Engineering, fabrication, erection and testing of the fire water tanks as per NFPA and Civil Defense Guide Lines

  2. Complete fire Water and Foam System as per NFPA and civil defense requirements

  3. Fire Pump Room with high pressure pumping system with 7 fire hydrants

  4. Foam Fire Fighting / deluge system with electrification

Piping :    Engineering, Fabrication, erection and testing of the complete piping system for the Tank farm as per ASME B 31.3 Process Piping.

Reliance Oil & Fuel Supply

December 31, 2015

Project Name       :    EPC - Reliance Storage Terminal

Client                    :    Reliance Oil & Fuel Supply

Storage Capacity   :    6107 m3        8 Nos.     Standards  .. API 650

Storage Capacity   :    4825 m3        8 Nos.     Standards  .. API 650

Storage Capacity   :    2488 m3        12 Nos.   Standards  .. API 650

 

Class                      :    Bureau Veritas

Year                       :    2016 (Ongoing Project nearing completion)

 

Scope                    :   

ENGINEERING

  1. Engineering Survey of the plot

  2. Preparation of Tank setting layout

  3. Preparation of Site plan

  4. Design of Tanks As per API 650

  5. Prepare of GA and fabrication of Drawings

  6. Design of Piping system as per ASME B 31.3

  7. Preparation of P & ID and PFD

  8. Preparation of Isometric Drawings

  9. Stress analysis of piping system

CIVIL

  1. Soil Testing and Soil improvement

  2. Construction of Tank Foundation

  3. Construction of Pump rooms and Office Buildings

  4. Construction of bund walls and Boundary walls

  5. Paving of interlock on the floor

MECHANICAL

  1. Construction of 28 Nos of Tank

  2. Fabrication and Erection of Complete piping system for the tank Farm

  3. Fabrication and Installation of Fire Fighting system including 1 Nos Fire water Tank.

  4. Installation of Rotary Equipment’s

ELECTRICAL

  1. Supply and installation of all cables and control panel in pump bay and gantry

  2. Supply and installation of MBD, MCC, SMBD & Control panels in the electrical room and cables connecting to pump bay DB's

  3. Supply and installation of Earthing System in all tanks and Gantries.

INSTRUMENTATION

  1. Supply and installation of Radar Gauging systems

  2. Supply and installation of the PLC SCADA automation system

  3. Supply and installation of CCTV system

  4. Supply and installation of Flow meters

 

TESTING & COMMISSIONING

  1. Service test for the Utility and Fire Fighting System.

  2. Testing of Piping System as per ASME B 31.3

  3. Testing of the tanks as per API 650

  4. Wet Commissioning of the entire tank farm.